Clarendon Road - Wallington - SM6
Service: Unvented Water Cylinder
Job Description: For this job Heat in London decommission and remove gravity fed cylinder in the kitchen along with the removal and decommissioning of the cold water storage tank in the storage cupboard.
Supplied and fitted a Powerflow smart 100l multipoint unvented hot water cylinder at the rear of the cupboard. This resulted in all hot water outlets being under mains pressure.
We then reconfigured the old tank fed cold supply into mains to give all bathroom cold outlets mains pressure.
Followed by the fitting of a thermostatic shower.
As included with this job all rubbish and discarded materials was removed from site.